Installation Project for Logistics Operator

From our delegation in Madrid we present one of the most innovative projects to date: installation of manual picking shelves with high turnover and low weight items (20 Kgs per item).
Our client, one of the most important Logistics Operators in the sector, has not hesitated to count on our services when it comes to renovating their merchandise storage and distribution center.

Project features

  • Comodit shelves 2.20 meters high with 7 levels.
  • 1000 X 500 mm modules for very light loads 20 Kg/level.
  • Storage capacity: 338 modules x 7 levels = 2,366 linear meters = 2.37 km of picking shelves..